This video shows a small fraction of the work that went into the Koi tanks which were built in the spring of 2010. We give a big thanks to all the people that helped with the construction and made this happen!
[Image]Mike is using the bobcat to break ground.
[Image]
[Image]Forming the first base.
[Image]The concrete truck has arrived.
[Image]First couple bases are poured and some walls are framed up.
[Image]
[Image]Air lines, fill lines and water lines are embedded in the walls.
[Image]
[Image]
[Image]
[Image]
[Image]The trench is ready for the waste line.
[Image]Prepping the tanks for the Polyurea liner.
[Image]
[Image]
[Image]Applying the Polyurea spray liner to waterproof the Koi tanks.
[Image]The gravel around the Koi tanks arrives.
[Image]
[Image]Electrical conduit for the power to the pumps and UV lights.
[Image]Placing the first Koi in the new tanks.
[Image]
[Image]
[Image]
[Image]Shade sails are installed above the tanks to keep the Koi cool.
"Koi Tank Construction 2010"